IH 30 The Canyon – TxDOT Dallas District

IH 30 The Canyon – TxDOT Dallas District

IH 30 “The Canyon” from IH 35E to IH 45 / IH 345 – TxDOT Dallas District Client: Texas Department of Transportation – Dallas District Project Type: Geotechnical Engineering, Roadway Design, Survey   About this Project EST provided design...
South Mustang Road Reconstruction

South Mustang Road Reconstruction

South Mustang Road Reconstruction – From SH 152 to the Railroad Client: City of Mustang Project Type: Roadway Design and Construction Management Services: Survey, Utility Relocation, Construction Phasing, Geotechnical, and Materials Testing About this Project...
SW34th Street Over Interstate 35 | City of Moore

SW34th Street Over Interstate 35 | City of Moore

SW34th Street Over Interstate 35 Client: City of Moore Project Type: Structural Design, Roadway Design, Traffic Engineering & Accessibility   About this Project EST worked to provide plans to the City of Moore from conceptual through to final design for an...
State Highway 6 – 4 Lane Reconstruction

State Highway 6 – 4 Lane Reconstruction

State Highway 6 – 4 Lane Reconstruction Project Type: Roadway Design, Traffic Engineering and Survey About this Project EST provided design services for transitioning 3.5 miles of an existing two lane highway to a four lane divided highway facility. This project...
State Highway 33 – 4 Lane Reconstruction

State Highway 33 – 4 Lane Reconstruction

State Highway 33 – 4 Lane Reconstruction Project Type: Roadway Design, Traffic Engineering and Survey About this Project EST provided design services for 9.5 miles of new construction of two lanes with right of way for a four lane divided and five lane undivided...
EST has been aquired by WSB. Click here.