SW34th Street Over Interstate 35 | City of Moore

SW34th Street Over Interstate 35 | City of Moore

SW34th Street Over Interstate 35 Client: City of Moore Project Type: Structural Design, Roadway Design, Traffic Engineering & Accessibility   About this Project EST worked to provide plans to the City of Moore from conceptual through to final design for an...
State Highway 6 – 4 Lane Reconstruction

State Highway 6 – 4 Lane Reconstruction

State Highway 6 – 4 Lane Reconstruction Project Type: Roadway Design, Traffic Engineering and Survey About this Project EST provided design services for transitioning 3.5 miles of an existing two lane highway to a four lane divided highway facility. This project...
US 259 Alignment Study

US 259 Alignment Study

US 259 Alignment Study McCurtain County Client: ODOT Project Type: Environmental Study, Alignment & Traffic Analysis About this Project US Highway 259 (US-259) is a two-lane, rural principal arterial route running from northeastern Texas to southeastern Oklahoma....
EOC Turnpike – NE 50th to NE 122nd Roadway & Bridge Design

EOC Turnpike – NE 50th to NE 122nd Roadway & Bridge Design

EOC Turnpike – NE50th to NE122nd – Roadway & Bridge Design Client: Oklahoma Turnpike Authority Project Type: Roadway & Structural Design About this Project EST was contracted by the Oklahoma Turnpike Authority (OTA) to complete the design for a 4.5...
Madill Bypass – US 70 Realignment Study

Madill Bypass – US 70 Realignment Study

Madill Bypass – US 70 Realignment Study Client: ODOT Project Type: Environmental Services, Alignment & Traffic Studies About this Project The construction of this project will provide an alternate route around the City of Madill along U.S. Highway 70. At the...
EST has been aquired by WSB. Click here.