Select Page
John Kilpatrick Turnpike – Southwest Loop

John Kilpatrick Turnpike – Southwest Loop

John Kilpatrick Turnpike – Southwest Loop Client: Oklahoma Turnpike Authority Project Type: Structural Design, Construction Management and Materials Testing   About this Project As a partner on the John Kilpatrick Turnpike (JKT) design team, EST provided...
South Mustang Road Reconstruction

South Mustang Road Reconstruction

South Mustang Road Reconstruction – From SH 152 to the Railroad Client: City of Mustang Project Type: Roadway Design and Construction Management Services: Survey, Utility Relocation, Construction Phasing, Geotechnical, and Materials Testing About this Project...
SH-152 Signal Upgrades and Synchronization – City of Mustang

SH-152 Signal Upgrades and Synchronization – City of Mustang

SH-152 Traffic Signal Upgrades and  Synchronization            City of Mustang Client:  City of Mustang Project Type: Traffic Analysis and Engineering  About this Project EST was retained to inventory, study, analyze and design improvements to the seven (7) signalized...
State Highway 6 – 4 Lane Reconstruction

State Highway 6 – 4 Lane Reconstruction

State Highway 6 – 4 Lane Reconstruction Project Type: Roadway Design, Traffic Engineering and Survey About this Project EST provided design services for transitioning 3.5 miles of an existing two lane highway to a four lane divided highway facility. This project...