Select Page
Paris District Pavement Coring

Paris District Pavement Coring

Paris District Pavement Coring About this Project EST is under contract with the Texas Department of Transportation, which includes providing pavement samples on various roadways within the Paris District utilizing Shelby push tubes at a depth of up to 48 inches. EST...
Christian Fellowship Church

Core Drilling Services

Core Drilling Services Project Type: Geotechnical & Materials Testing About this Project EST is under an on-call contract with TxDOT that includes acquiring pavement samples on various roadways within the Paris District utilizing Shelby push tubes at a depth of up...
Cedar Lane/Black Locust Court to 36th Ave.

Cedar Lane/Black Locust Court to 36th Ave.

Cedar Lane Black Locust Court to 36th Ave. Project Type: Roadway Design Analysis, Geotechnical & Materials Testing About this Project EST provided a design analysis on Cedar Lane Road to determine a transportation design that will be cost effective, minimally...
South Mustang Road Widening From SH 152 to Railroad

South Mustang Road Widening From SH 152 to Railroad

South Mustang Road Widening From SH 152 to Railroad Project Type: Roadway Design, Survey, Geotechnical, and Construction Management About this Project EST provided geotechnical services that included five borings drilled within the existing pavement to a depth of...