State Highway 33 – 4 Lane Reconstruction
Project Type: Roadway Design, Traffic Engineering and Survey
About this Project
EST provided design services for 9.5 miles of new construction of two lanes with right of way for a four lane divided and five lane undivided facility. The primary objective of this project was to reconstruct SH-33 to meet the current design standards. This project created two new lanes adjacent to the existing lanes and provided construction of cross drain structures for the future four lane divided facility. The last 2 miles of the project extents were transitioned to a five lane undivided facility with a center turn lane. All construction phases allowed for traffic to be maintained along SH-33 during construction.