EST provided engineering services for the City of Mustang to design and manage the reconstruction of the South Mustang Road Widening Project.

Project involved roadway widening, two-way left turn lane (TWLTL) addition, storm sewer system, grading, and paving.  This road provides access to one of the largest high schools in the state.  This project’s purpose was to improve safety, to alleviate high traffic levels, to provide a safe, ADA compliant pedestrian sidewalk, and to drain a relatively flat roadway. 

This project provides construction phasing to maintain one-way access, which was a major project challenge.  An additional challenge required some storm sewer construction phasing into a standalone project, which was not anticipated at the original project scoping.  Project required multiple meetings to meet city concerns, to discuss design criteria, and to ensure ongoing school construction project phasing.   EST provided bidding services and is currently performing construction inspection.

Services provided

  • Roadway / Construction Plans
  • Construction Phasing
  • Geotechnical Investigation
  • Materials Testing
  • Right of Way Plans and Acquisition
  • Utility Relocation
  • Storm Water Systems
  • Water and Sewer System Replacements
  • ADA enhancements
  • Environmental Clearance

Project Photos

Related Projects

Chandler Park Bridge

Chandler Park Bridge

111th Intersection in Jenks

111th Intersection in Jenks

Brame Bridge – ODOT Local Gov – Pushmataha County

Brame Bridge – ODOT Local Gov – Pushmataha County

IH 30 The Canyon – TxDOT Dallas District

IH 30 The Canyon – TxDOT Dallas District

Melissa Road & Harrison Street Improvements – City of Melissa

Melissa Road & Harrison Street Improvements – City of Melissa

SH-360 Tarrant County – Quality Control Management

SH-360 Tarrant County – Quality Control Management

US-75 TxDOT Paris District Collin/Grayson County

US-75 TxDOT Paris District Collin/Grayson County

I-40 & Choctaw Road Interchange

I-40 & Choctaw Road Interchange

Francis-Tuttle Vo-Tech Edmond Campus

Francis-Tuttle Vo-Tech Edmond Campus

John Kilpatrick Turnpike – Southwest Loop

John Kilpatrick Turnpike – Southwest Loop

Gilcrease Turnpike – Construction Management

Gilcrease Turnpike – Construction Management

South Mustang Road Reconstruction

South Mustang Road Reconstruction

SW34th Street Over Interstate 35 | City of Moore

SW34th Street Over Interstate 35 | City of Moore

State Highway 6 – 4 Lane Reconstruction

State Highway 6 – 4 Lane Reconstruction

US 259 Alignment Study

US 259 Alignment Study

OTA Driving Forward Bond Program

OTA Driving Forward Bond Program

Kilpatrick Turnpike Bridge Rehabilitation & Widening – North Canadian River

Kilpatrick Turnpike Bridge Rehabilitation & Widening – North Canadian River

Lighted Walking Trails – Choctaw Nation Community Centers

Lighted Walking Trails – Choctaw Nation Community Centers

SH-152 Signal Upgrades and Synchronization – City of Mustang

SH-152 Signal Upgrades and Synchronization – City of Mustang

Riverwind Casino

Riverwind Casino

WinStar World Hotel & Casino

WinStar World Hotel & Casino

EOC Turnpike – NE 50th to NE 122nd Roadway & Bridge Design

EOC Turnpike – NE 50th to NE 122nd Roadway & Bridge Design

Madill Bypass – US 70 Realignment Study

Madill Bypass – US 70 Realignment Study

Winstar Village Apartment Complex

Winstar Village Apartment Complex

Jay Hodge Chrysler Dealership – Hugo, OK

Jay Hodge Chrysler Dealership – Hugo, OK

Chickasaw Travel Stop – Davis

Chickasaw Travel Stop – Davis

Chickasaw Travel Stop – Winstar

Chickasaw Travel Stop – Winstar

School Parking Lots

School Parking Lots

Fish Creek at Cheley Camp Restoration

Fish Creek at Cheley Camp Restoration

City of Mustang Water/ Waste Water Treatment Plant

City of Mustang Water/ Waste Water Treatment Plant

City of Durant Waste Water Treatment Plant

City of Durant Waste Water Treatment Plant

City of Duncan Water Treatment Plant

City of Duncan Water Treatment Plant

Duncan Bypass

Duncan Bypass

State Highway 33 – 4 Lane Reconstruction

State Highway 33 – 4 Lane Reconstruction

Rock Creek Road

Rock Creek Road

South Quebec Street – Iliff to Iowa

South Quebec Street – Iliff to Iowa

John Kilpatrick Turnpike

John Kilpatrick Turnpike

36th Avenue NW and Havenbrook Intersection Improvements

36th Avenue NW and Havenbrook Intersection Improvements

Quincy Rd at W. Bijou Creek

Quincy Rd at W. Bijou Creek

Norman Regional Medical Center

Norman Regional Medical Center

Hippy Bridge

Hippy Bridge

Paris District Pavement Coring

Paris District Pavement Coring

Christian Fellowship Church

Christian Fellowship Church

Core Drilling Services

Core Drilling Services

Cedar Lane/Black Locust Court to 36th Ave.

Cedar Lane/Black Locust Court to 36th Ave.

Divide Loop Rd/County Road EW 175

Divide Loop Rd/County Road EW 175

Kingston Park Survey

Kingston Park Survey

Stream Bank Stabilization Study

Stream Bank Stabilization Study

Turner Turnpike Supplemental Survey

Turner Turnpike Supplemental Survey

Cedar Lane Roadway

Cedar Lane Roadway

Bridge Inspection over Arkansas River

Bridge Inspection over Arkansas River

Paris, TX Construction Oversight on Various Streets

Paris, TX Construction Oversight on Various Streets

Federal Over Colfax Bridge

Federal Over Colfax Bridge

US285 at Schaffers Crossing

US285 at Schaffers Crossing

US Highway 64

US Highway 64

I-35/US-70

I-35/US-70

I-40 Over Washita River

I-40 Over Washita River

Atoka Sports Complex

Atoka Sports Complex

Chickasaw Travel Stop – Ada Oklahoma

Chickasaw Travel Stop – Ada Oklahoma

Contact Us

615 N Hudson Avenue, Suite 300 Oklahoma City, OK 73102

(405) 815-3600

(405) 815-4080

EST has been aquired by WSB. Click here.